Curtain Road 87-95, London – Residential Regeneration, Phase 1 Enabling Works

The Curtain Road project includes demolition of 2 connected buildings, basement excavation, piling installation and construction of RC basement and ground floor.

  • 2 of 3 adjoining party walls to be retained with the aid of extensive temporary works
  • Archaeological excavation
  • Ground source heating system installed in piles
  • Confined City Centre site and stakeholder interface requirements