SYSCO / Pallas Foods Distribution Centre

Design and Build contract for a major retail distribution centre comprising refrigerated and dry warehousing with high specification office space along with extensive siteworks on a 40 acre site.

  • 15,000 sq.m refrigerated warehouse (-29°C to +7°C)
  • Dry ware house (13,000 sq.m) and high specification office fit-out (2,260 sq.m)
  • On a 40 acre site including soil stabilisation, attenuation ponds, site services, hard and soft landscaping
  • Structural steel with insulated wall and roof
  • Integration with Client specialist subcontractor Racking and Mini-loading System
  • Full design / build Sprinkler System to FM requirements
  • Fuelling and vehicle maintenance facilities