John Paul Construction

Profile Park Link road

Construction of 1.8 km of dual and single carriageway including one roundabout intersection and tie-in to an existing un-signalised roundabout on a major link road to facilitate development of a 100 acre Business Park.

  • Third party consultations – SDCC, ESB, Grange Castle Golf Club, local residents
  • Phased TTM design involving multiple traffic switch overs for live roundabout construction
  • Substantial earthworks due to site topography and soils including soil stabilisation
  • Dual and single carriageway roads of 0.5 km and 1.3 km respectively with 2 roundabouts
  • Extensive hard and soft landscaping
  • Foul and storm water drainage including attenuation
  • 1.0 m pipe dia trenchless pipeline (pipe jack) under live carriageway