Polmadie Maintenance Depot

Construction of a new Winter Maintenance Depot on a Brownfield site on the east side of Glasgow city including construction of an outfall storm water pipeline.

  • Brownfield heavily contaminated site (23,000 sq.m)
  • Earthworks cut/fill in heavily contaminated soils including asbestos fibres
  • Soft ground improvement techniques
  • Surface water drainage, foul drainage, utility ducting and SUDS attenuation pond
  • 450mm diameter outfall pipeline construction across live carriageways (J1 M74)
  • Landscape screening berm, boundary fencing and RC walls
  • Reinforced air entrained concrete slab and permeable paved car parks