Polmadie Strategic Winter Maintenance Depot Phase 1

Design, Construction and Environmental management of earthworks operations during the construction of a new Winter Maintenance Depot on a Brownfield site on the East side of Glasgow City.

  • Advance targeted site investigation with materials sampling and analysis
  • Contractor involvement in adapting design to suit site conditions including VE
  • Controlled excavation, segregation and on site testing
  • Asbestos monitoring, air sampling and recording
  • On-site de-contamination facilities
  • Third party consultations – SEPA, Glasgow City Council,  local residents
  • Disposal of non-hazardous and hazardous materials